![Loading Events](https://www.kickinghorsecanyon.ca/app/plugins/the-events-calendar/src/resources/images/tribe-loading.gif)
2-lane traffic with possible 2-minute stoppages for equipment movement throughout July
July 1 @ 12:00 am – July 31 @ 11:59 pm
Momentary interruptions up to 2 minutes possible anytime in June to allow movement of equipment. From July 25-31, both eastbound lanes will be open with some localized lane reductions. Westbound traffic will be kept to a single lane until July 31.