At Lynx Viaduct, crews place the final box girder of the project (September 2023)A finger expansion joint installed between the Bighorn Bridge and the Lynx Viaduct (August 2023)Rockfall protection mesh being installed just east of Elk Viaduct (July 2023)With the concrete deck poured and curing, the eastbound lanes of Bighorn Viaduct will go into service at the end of June (June 2023)Workers make final adjustments before a concrete paving machine is used to pour the deck of Caribou Viaduct (May 2023)Panels being installed as part of the MSE (Mechanically Stabilized Earth) wall at Caribou (April 2023)The Shark Cage, purpose-built for the Kicking Horse Canyon Project (March 2023)Bighorn Bridge on the right, overlooking the canyon and CP rail tracks below (February 2023)Frenchman’s Bridge and Cut 3 being readied to accommodate traffic (November 2022)Blackwall bridge, looking west, with Hedgehog viaduct in the foreground and Grizzly viaduct in the background (October 2022)Kicking Horse Canyon (October 2022)