NumPics = 1; // number of pics to be displayed on page (this is the x in 'x of N')(drawn at random)
displayCaption = true;

// EDIT THIS ARRRAY TO INCLUDE THE SET OF ALL POTENTIAL IMAGES
theImages = new Array(); // do not change this

// IMAGE NAMES ARRAY - relative path to images
// To add more image files, continue with the
// pattern below, adding to the array.
// PATTERN:
// theImages[x] = ['path to image', 'caption text'];


theImages = [

	 ['100616_PH3W_Golden_View_detour.jpg', 'June 16, 2010 - Phase 3 West: Golden View Rd. Detour in operation.']
	,['100614_PH3W_Excavation_detour.jpg', 'June 14, 2010 - Phase 3 West: Golden View Rd. Detour - east tie-in excavation.']
	,['100614_PH3W_GRV_detour.jpg', 'June 14, 2010 - Phase 3 West: Golden View Rd. Detour - signage and concrete barriers installation.']
	,['100610_PH3W_Hydro_poles.jpg', 'June 10, 2010 - Phase 3 West: Hydro poles relocation on Golden Hill to accommodate the widening to 4 lanes.']
	,['100601_PH3W_paving_detour.jpg', 'June 1, 2010 - Phase 3 West: Golden View Rd. Detour - beginning of paving.']
	
	,['100415_CandG.jpg', 'April 15, 2010 - Phase 3 West: Clearing and grubbing east of the avalanche gates.']
	,['100418_excavation.jpg', 'April 18, 2010 - Phase 3 West: Beginning of earthworks for the widening of the TransCanada Highway east of Golden.']
	,['010421_embakment.jpg', 'April 21, 2010 - Phase 3 West: Embankment construction Golden View Rd. detour.']

	,['091113_crash_attenuator.jpg', 'October 9, 2009 - New Golden Hill 4th lane features median barrier with crash attenuator.']
	,['091014_4th_lane_open.jpg', 'October 9, 2009 - Golden Hill 4th Lane is open for traffic.']
	,['091014_4th_lane_paint.jpg', 'October 5, 2009 - Painting lines on the newly built Golden Hill 4th Lane.']
	,['090917_catch_basin.jpg', 'September 17, 2009 - Digging trench to receive one of the thirteen catch basins that will be installed in the new 4th lane at Golden Hill.']
	,['090917_saw_machine.jpg', 'September 17, 2009 - Golden Hill 4th Lane – Saw machine used to cut pavement.']
	,['090911_sgsb_placement.jpg', 'September 11, 2009 - Golden Hill 4th Lane – SGSB placement.']
	,['dl_crew.jpg', 'August 4, 2009 - Golden Hill 4th lane extension: Day Labour crew.']
	,['090806_dl.jpg', 'July 31, 2009 - Grade construction of the Golden Hill 4th lane extension was finished in July 31, 2009 ahead of schedule. Paving work to follow.']
	,['hauling_truck.jpg','July 9, 2009 - 4th westbound lane down the Golden Hill under construction.']
	,['clearing_grubbing.JPG','June 17, 2009  - Clearing and grubbing for the 4th lane of Golden Hill.  '] 
	,['dust_control.JPG','June 17, 2009  - 4th Lane Golden Hill: Dust control.  '] 
	,['surveyor.jpg','June 17, 2009  - 4th Lane Golden Hill: Surveyor setting slope stakes.  '] 
	,['Golden_Hill_4th_Lane_Construction.jpg', 'May 27, 2009 - Aerial view of construction of the 4th westbound lane down Golden Hill.']


];
