Kicking Horse Canyon Project
#  
 

 

 

#
Premier's Award  - Innovation 2006/2007

Project Overview Presentation


#

Kicking Horse Canyon Videos

Kicking Horse Canyon - Simulation of Possible Improvements
(Highway Perspective Flythrough)

Design work is under way to improve the most difficult section of the canyon (the four kilometres from West Portal to Yoho Bridge) by widening to four lanes, straightening and levelling the alignment, and eliminating rock fall and other hazards. The improved route is expected to require side-by-side tunnels, approximately 6 hazard protection sheds, and up to 12 bridges. This video shows a simulation (travelling from west to east) of such possible future improvements from a highway-level perspective. To see a high-up view of this simulation, go to the Aerial Perspective Flythrough.

The Kicking Horse Canyon Project is currently in the third of four phases.


Kicking Horse Canyon - Simulation of Possible Improvements
(Aerial Perspective Flythrough)

Design work is under way to improve the most difficult section of the canyon (the four kilometres from West Portal to Yoho Bridge) by widening to four lanes, straightening and levelling the alignment, and eliminating rock fall and other hazards. The improved route is expected to require side-by-side tunnels, approximately 6 hazard protection sheds, and up to 12 bridges. This video shows a simulation (travelling from west to east) of such possible future improvements from an aerial perspective. To see a close-up view of this simulation, go to the Highway Perspective Flythrough.

The Kicking Horse Canyon Project is currently in the third of four phases.


The Past, Present and Future of a Transportation Route

Sit back and enjoy a trip through the Kicking Horse Canyon! This tour starts in the days before “planes, trains and automobiles”, travels through the building of the original Trans-Canada Highway, makes a pit stop at the upgrade work underway in 2011, and finishes with a glimpse into the future of this nationally significant transportation route.


Phase 3 Golden Hill to West Portal Section - Blasting 2011

Click on the link to view the blasting that took place on May 11 about 3 kilometres east of Golden as part of the work to straighten and widen theTrans-Canada Highway to four lanes.

 


Kicking Horse Canyon 2010 - Phase 3 Construction Update

Click on the links below to view, or to download these videos right click on the prefered format here and choose
"save target as"

Flash Version (29 MB SWF)
Media Player Version (77 MB WMV)
Quick Time Version (98 MB MOV)


Retrospective 2008 - Phase 2 (Park Bridge and approaches) completion

Click on the links below to view, or to download these videos right click on the prefered format here and choose
"save target as"

Flash Version (61 MB SWF)
Media Player Version (74 MB WMV)
Quick Time Version (98 MB MOV)


Kicking Horse Canyon Project - Park Bridge Pier Construction
and Girder Launching 2007

Click on the links below to view, or to download these videos right click on the prefered format here and choose
"save target as"

Media Player Version (29 MB WMV)
Quick Time Version (194 MB MOV)


Kicking Horse Canyon Project - Construction Progress,
Challenges and Highlights of 2006